G2 Energy wind turbine installation film

Project Description

Filmed during the second half of last year, this programme follows the groundworks and installation of a wind turbine in North Lincolnshire.

Produced for G2 Energy this film was shot using GoPro Hero2 HD cameras coupled to a timer mechanism and 20 Amp battery which enabled us to install the cameras for one week at a time.

Supplementing the timelapse footage are some real time shots, shot on XDCAM HD. installing wind turbines is commonly thought to be the answer to green renewable free energy and is the power generation for the future.

www.g2energy.co.uk

Facebooktwitterredditpinterestlinkedin

Project Details

Tags: Corporate Productions

Back to Top